    The entire Ibadan main City and parts of Ibadan less City are divided into 4 distribution zones as here-under specified:
    1. Osegere distribution Zone (100% Completed)
    Primary main from Osegere treatment plant via Erunmu booster station to Lalupon elevated tank=13.41Km Distribution network in the following communities:
  • Erunmu = 3.8Km
  • Ejioku = 9.65Km
  • Osegere = 2.84Km
  • Lalupon =2.84Km
  • Egbeda = 5.9Km
  • Iyana-Offa = 4.23Km
  • Erunmu = 4.12Km
  • Ile Igbon = 4.97Km
  • 2. Ibadan North Distribution Zone: (90% Completed)
  • Mokola(Pump Station) – Oke-Itunu = 3.5Km
  • Mokola Veterinary – Oke-Itunu junction =5.4Km
  • Sango – Alaro =5.2Km
  • Railway crossing-Eleyele =3.6Km
  • Alaro-Poly/Eleyele Road junction =4.7Km
  • Poly Rd/Eleyele/Apete junction = 5.1Km
  • Apete/Poly junction- UI =3.8Km
  • Apete-Sasa(to be opened up) =3.6Km
  • Apete junction- Awotan =4.4Km
  • Vet. Junction-Orogun/Niser-Sasa =8.09Km
  • 3. AGUGU DISTRIBUTION ZONE (91% Completed)
  • Iwo Rd-Adegbayi =4.4Km
  • Akobo bridge-Akobo rail line =3.2Km
  • Iwo Rd bridge-Olodo = 7.4Km
  • Old Ife Rd-Adegbayi =5.5Km
  • Oremeji bridge-Airport =5.8Km
  • Olorunsogo bridge-Jagun =4.8Km
  • Academy bridge-Olomi =2.5Km
  • Muslim bridge-Muslim = 1.2Km
  • Olomi- Oke-odo, Orogun/Akanran Rd/Airport Alakia = 15Km
  • 4. OLUYOLE DISTRIBUTION ZONE :(92% Completed)
  • Ososami Booster station-Apata junction = 8Km
  • Apata junction –Oluyole =3Km
  • Oluyole/Apata Rd junction-Apata ganga/Olosun Rd junction = 7Km
  • Olosun Rd/Apata ganga Rd/ Abeokuta Rd junction = 2.84Km
  • Apata Rd/Church junction – Owode Estate/Apata ganga Road = 8.4Km
  • Owode Estate ground reservoir-Owode Estate/Abeokuta Rd Junction =4.5Km